Connecting to a sewer

蓝灯github更新-旋风加速度器

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

蓝灯github更新-旋风加速度器

蓝灯github更新-旋风加速度器

橡树加速器最新版,橡树加速器安卓下载,橡树加速器npv,橡树加速器跑路了  红客加速器官网,红客加速器官方网址,红客加速器mac下载,红客加速器跑路了  回锅肉加速器最新版,回锅肉加速器官方网址,回锅肉加速器电脑版下载,回锅肉加速器mac下载  快橙加速器官网网址,快橙加速器免费试用,快橙加速器2024年,快橙加速器vpm  神龙加速器永久免费加速,神龙加速器用不了了,神龙加速器2024年,神龙加速器打不开了  expcl下载地址,expclmac下载,expcl用不了了,expcl2024  大哥云加速器npv,大哥云加速器vnp,大哥云加速器免费永久加速,大哥云加速器跑路了